SUBSTATION P&C · WIRING DRAWING REVIEW
Traced end to end.
Every check shown.
YELLOW WHERE BOTH ENDS AGREE · A THIN CLOUD WHERE THEY DON’T
NO MARK MEANS NOT CHECKED
SchemeTrace is an engineer-supervised AI assistant that checks substation protection & control wiring drawings the way a QA/QC engineer does. The deliverable is your drawing — returned with markups.
One synthetic breaker, 52-21, followed from the switchyard down through the drawing set: an angled bird’s-eye view over a generic two-bay substation slice — A-frame dead-end structures with V-string insulators, a stand-mounted wave trap, CCVTs, vertical-break disconnects on insulator columns, a three-phase dead-tank breaker with bushing CT turrets on a lattice stand, a three-tube rigid bus on A-frame stands, perimeter fence, cable trench and control enclosure — then an exploded isometric stack of four sheets, each labeled with its drawing number: a one-line showing both incoming lines off the shared bus, each with a disconnect either side of its breaker and two CT sets per bushing side, with relay lenses, a lockout trip stack and a telemetry fan; a three-line with gang-operated disconnects and the numbered CT circuit running through terminal-block landings and a test switch into the 87T relay; the breaker CT wiring detail with all five taps landed and only the selected pair in use; and a panel wiring snippet with terminal-block cells, an incoming cable, a test switch ahead of the relay (phase A shown) and the CT common grounded at one point. A single dashed trace leaves the bushing CT turret, rides the cable trench into the control enclosure and drops through every sheet along the checked circuit; on the panel sheet every call-out on the checked conductor names its next landing, TS-42 pole by pole, and both reciprocal pairs are verified yellow, and one mismatch on the X1-2 return carries a violet and red discrepancy cloud at each end, tagged RF-01 and red-lined by the reviewer with its correction to TS-42-4.
ZONE A · READ THE MARKUP
Three marks. Three meanings.
No dashboard to learn, no report to reinterpret. The deliverable is the drawing set itself, marked up the way a checker would leave it.
ZONE B · THE METHOD
It closes the loop.
Every wiring checker knows the ritual: start at a terminal block, follow the call-out to the device sheet, find the reciprocal call-out, and come back to where you started. Terminal block → device → back to a terminal block, with both ends agreeing — a closed loop. It’s the only honest definition of checked. The name is the method.
Checking a set by hand means holding a dozen sheets in your head at once, on a deadline, across hundreds of circuits — more than any schedule allows. For every connection it traces, SchemeTrace reads the actual set — panel wiring, schematics, one-lines, circuit and cable lists — and compares both ends: terminal references, wire tags, conductor colors and sizes. A call-out with no answering call-out is a candidate error, not a footnote. And it brings the same attention to sheet two hundred as to sheet one.
WHAT ONE TRACE COMPARES — AT BOTH ENDS:
ZONE C · SUPERVISION
Review-ready. Never auto-approved.
Nothing SchemeTrace finds is final until an engineer says so. If you’re skeptical of AI in protection work — good. That skepticism is the design basis, not a marketing problem.
GENERAL NOTES
- EVERY FINDING IS REVIEW-READY, NEVER SELF-APPROVED.
- A HUMAN ENGINEER CONFIRMS, CORRECTS, OR REJECTS EACH ONE.
- EVERY DECISION IS PRESERVED AS AN AUDITABLE TRAIL.
- EVERY CLAIM TRACES TO A LOCATION ON A SOURCE SHEET.
If a claim can’t be traced to the drawing, it doesn’t belong on the drawing. SchemeTrace is designed to be checked — that is the point.
ZONE D · SCOPE
What it won’t do.
- It will not catch every error.
- It will not approve a design.
- It will not replace your checker, or your stamp.
- It will not run unsupervised.
And we don’t publish accuracy numbers — because we don’t yet have numbers we’d put our name on. When we do, you’ll see the basis for them.
What it does instead is narrower, and more useful: the tracing an engineer would do with a highlighter and patience, surfaced for an engineer to settle. It will flag things that turn out fine. You settle them — that’s the job.
ZONE E · PROVENANCE
Built by a checker, for checkers.
SchemeTrace is built by a practicing substation protection engineer who got tired of chasing reciprocal call-outs across sheets by hand. It’s in engineering pilot — exercised on real drawing sets by its author, with every finding settled by an engineer. There’s no public release yet.
If you review P&C wiring for a living — or manage the people who do — we want your skepticism early.
SECURITY & DATA HANDLING — OUR COMMITMENTS
- YOUR DRAWINGS ARE NEVER USED TO TRAIN MODELS.
- EVERY REVIEW RUNS ISOLATED, PER CLIENT.
- YOUR FILES ARE DELETED ON REQUEST — COMPLETELY.
Formal security documentation comes with the pilot agreement. This page itself sets no cookies and runs no analytics.
ZONE F · EARLY ACCESS
See it on a drawing set.
We’re opening early access to a small group of P&C engineers, utility teams, and substation design firms. Tell us where to reach you.
No pricing, no demo theater, no drip campaign — a conversation with the engineer who built it. Please don’t include confidential project details.
Prefer to poke holes first? hello@schemetrace.com — ask us a hard question.